Upgrade from Xviz 3.2 to 3.3

161 views
0

Hello,

I have several reports with xviz 3.2 charts. If I upgraded to 3.3 – are the visuals made with 3.2 going to work?

Also, how is the upgrade working – do I need to remove the 3.2 visuals from PowerBi Admin and then install 3.3 or they the two sets can work in parallel?

Thanks,
Martin

martin.gramatikov@hiil.org

Answered question