Posted an answer
Data types for Gantt Chart

Duration needs to be a numeric type. you will not able to assign duration when the end Date is assigned. It is possible only to assign either duration or end date. When duration is assigned its addition...

February 18, 2021 5
Posted an answer
How to put the week numbers instead of dates in the header of Gantt chart?

At present, it is not possible to put the week number in the timeline.

February 18, 2021 5
Posted an answer
Gantt chart…how many levels does it go?

There is no restriction on the number of levels shown in Gantt. can you please share a sample .pbix file and expected output to find out the cause of the issue.

February 18, 2021 5
Posted an answer
xViz Gantt Drill Through

Yes, Gantt will support drill-through.

February 18, 2021 5
Posted an answer
Gantt visual milestone database with new update

Hi, If the start and end date are the same, it will be considered a milestone. (or) You can add a separate dimension as a milestone in the milestone field. There are options to show milestone in parent...

October 29, 2020 5
Answer was selected as best
July 27, 2020 10
Received an upvote
July 22, 2020 2
Posted an answer
conditional formatting for data color

Hi, you can refer to this blog, https://xviz.com/visuals/multi-axes-chart/ In this blog, there is a full-length video on the latest feature of multiple Axes chart, After 11th-minute conditional formatting...

July 22, 2020 5
Posted an answer
Data Colors

Yes, You can Keep data Color consistent using conditional formatting. Refer the below screenshot In Parallel  Coordinates there is no need for conditional formatting, you can set colors directly in data...

July 22, 2020 5
Posted an answer
conditional formatting for data color

Yes, You can override data Color using conditional formatting. Refer the below screenshot By conditional Formatting, you can make date color consistent across all visuals

July 22, 2020 5
Posted an answer
Gantt chart milestones

1.Only Assing Project to the taskName.Also, make sure taskName is not repeated. 2 a. Then you can assign milestone what you want to show to the milestone Field. b. Chose Display as Marker in Milestone...

July 22, 2020 5
Posted an answer
Can we use non-dates as Gantt start/end dates

No, the Gantt Start Date field needs to be a data, But instead of the EndDate field, you can add the measure to duration. Also, I am not able to get what you want to achieve it will help if you attach...

July 22, 2020 5
Posted an answer
What are the required data types and aggregations for the Gantt to work properly?

Hi, 1. You can refer to this blog https://xviz.com/blogs/xviz-gantt-chart-configuration-a-step-by-step-guide/ on how to configure each field. 2. It will be better if you attach the .pbix file for finding...

June 25, 2020 5
Posted an answer
Gantt chart: milestone at Task level

It is possible to view milestones at parent level by enabling show in parent option in milestone Tab of AdvanceEditor.To know a description of each milestone type you can use a legend.

June 13, 2020 5
Posted an answer
Gantt Chart – is there a way to display vertical week separators?

unfortunately, it is not possible with the current version of Gantt but in the upcoming version, we provide a daysoff feature that can be used to achieve what you want. As an alternative in the current...

June 13, 2020 5
Posted an answer
How to customize gantt chart timelines

That option is under advance editor, you can access the advance editor by clicking the highlighted icon in the image.

May 11, 2020 5
Posted an answer
How to customize gantt chart timelines

yes, it is possible with the latest Gantt version.you can download the latest version from our website. Then configure zoom levels as above, and turn off the middle level of the timeline.

May 8, 2020 5
Posted an answer
Task/Subtask

As you can see in the tooltip, in some rows  startDate is greater than endDate. That is the reason why progress gets filled in the opposite direction.

February 6, 2020 5
Posted an answer
Task/Subtask

can you please share the application.

February 5, 2020 5
Answer was selected as best
Milestones in gantt-chart in Power BI

yes, It possible to create a milestone on specific dates.

January 9, 2020 10